Owner | Joe & Tom Huemann | ||||
---|---|---|---|---|---|
Location | Johnsburg, Illinois United States map | ||||
Web/Email | WebPage | ||||
Vehicle | 2001 Chrysler PT Cruiser This is a brother bonding project. It belongs to my brother Joe who asked if I would be interested in help him do a conversion. He is the original owner. The motor blew last winter and he didn't know what to do with it. When gas went to $4.00 a gallon, we thought we'd go for it. | ||||
Motor | Netgain Warp 9 Series Wound DC | ||||
Drivetrain | Front wheel drive 5 Speed Manual Trans | ||||
Controller | Raptor 1200 | ||||
Batteries | 12 Discover EV31A-A, 12.00 Volt, Lead-Acid, AGM | ||||
System Voltage | 144 Volts | ||||
Charger | Eltron 3000 watt 115VAC and 230VAC | ||||
Heater | none yet | ||||
DC/DC Converter | Iota 55 amp | ||||
Instrumentation | Volt meter amp meter mounted on the "A" post | ||||
Top Speed | 65 MPH (104 KPH) drove 50 mph 4-25-09 3rd gear 175-200 amp | ||||
Acceleration | GREAT!, 4 people in the car 3rd gear 1& 2 gear squeals the tires | ||||
Range | 25 Miles (40 Kilometers) shooting for 40 miles 26-28 miles we startat 158 volts and have 140 volts after 28 miles | ||||
EV Miles |
| ||||
Seating Capacity | 4 | ||||
Curb Weight | 3,820 Pounds (1,736 Kilograms) As an ICE 3100 # 1860 front wheels 1860 back wheels | ||||
Tires | for now stock | ||||
Conversion Time | to date @200 hours If we did it again we could do it in 1/2 the time. | ||||
Conversion Cost | est $8500.00 budget $10,000 98% done | ||||
Additional Features | Power steering and power breaks are now functiong 3/20/09 power steering, 1989 Subaru electric pump, vaccum pump Insulated battery boxes, inertia switch, main power shut-off 5-22-09 we have 110 miles on it, working great. We are going to return 4 of the batteries becuse they discharger faster than the others. | ||||
As of 10-2009 STARTED project 5-1-09 30 miles on the EV. running GREAT! learning what it will do. Really happy with how it is running. For more pictures click on WebPage |